Home

About PES

Service Offerings

Why PES?

How Clients Benefit?

A History of Success

Case Studies

Affiliations

Publications

Press

A History of Success

Phone: 734-425-3904

Fax: 734-425-3751

E-mail: jmiller@pessolutions.com

Chrysler

General Motors

Ford

Saturn

Detroit Diesel

Caterpillar

The Murray Ohio Mfg. Co.

Crain-Drummond

E.I. DuPont De Nemours

Midland Steel Products

Murray Outdoor Products

Deere & Company

ANCO Products

OMMC / MOBIS

To contact us:

BEI Associates

ESG

Ghafari

Business Transformation

CKGP

DSI

WALTCO Truck Equip.

ABB

DURR

Acco Systems Division

Litton Industrial Automation

Automatic Systems

Clintec.

“New, improved Jeep plant in Toledo gets an ‘A’ for efficiency.”

 

“The improvement it (DCX Toledo Assembly Plant) represents over its predecessor is truly astronomical.”

 

“Rebalanced assembly lines for snow thrower operations resulting in $450,000 + / year direct labor savings.”

 

“This truck program was considered the most successful launch in automaker’s history... implemented on schedule with little impact to production.”

 

“Reengineered labor standards and improved methods in metal fabrication area resulting in $100,000 / year labor savings.”

 

“Redesigned printing products manufacturing plant layout that significantly improved product flows and reduced material handling costs.”

 

“Identified $2,000,000 cost avoidance without compromising delivery service of JIT Shipping/ Transportation System for door trim parts.”

 

“The operations assessment results gave management a new motivation and focus for change.”

 

“Increased productivity by over 20% in final assembly operations.”

 

“Streamlined operations, improved customer service and reduced labor requirements in warehouse.”

 

“What you do find is the absolute proven state of the art in every corner and aisle; … a lean inventory system ruled by an electronic version of kanban, the famous Japanese Just-In-Time method;”

 

All rights reserved.

Text Box: Celebrating 19 Years of Success.
1991—2010

Productivity Engineering Services

“Solutions For World Class Performance”